Northeast India’s Only English and Hindi Satellite News Channel

ISRO successfully performs orbit reduction manoeuvre, brings Chandrayaan-3 closer to moon

First Published: 7th August, 2023 8:03 IST

The space agency said it will carry out the next such operation on August 9.

The Indian Space Research Organisation (ISRO) on Sunday said the GSLV Mark 3 (LVM 3) heavy-lift launch vehicle, which lifted off successfully with the Chandrayaan-3 spacecraft, underwent a planned orbit reduction manoeuvre, bringing it closer to the moon.
The space agency said it will carry out the next such operation on August 9.

“The spacecraft successfully underwent a planned orbit reduction manoeuvre. The retrofitting of engines brought it closer to the Moon’s surface, now to 170 km x 4313 km. The next operation to further reduce the orbit is scheduled for August 9, between 13:00 and 14:00 hours IST,” the ISRO tweeted on Sunday.
Meanwhile, the space agency on Sunday put out the first images of the moon as captured by Chandrayaan-3, India’s third lunar mission.

Chandrayan-3 captured stunning images of the lunar surface after entering the Moon’s orbit on Saturday.
“The Moon, as viewed by #Chandrayaan3 spacecraft during Lunar Orbit Insertion (LOI) on August 5, 2023,” tweeted the Mission’s official Twitter handle.
The Chandrayaan-3 spacecraft, which covered about two-thirds of the distance to the Moon since its launch, successfully entered into the Lunar orbit on Saturday, according to ISRO.
The spacecraft, mounted on GSLV Mark 3 (LVM 3) heavy-lift launch vehicle, successfully lifted off from the Satish Dhawan Space Centre in Andhra Pradesh’s Sriharikota on July 14.
India became only the fourth country after the US, China, and Russia to land its spacecraft on the surface of the moon, demonstrating the country’s ability for a safe and soft landing on the lunar surface.
Upon landing, it will operate for one lunar day, which is approximately 14 Earth days. One day on the Moon is equal to 14 days on Earth.
The approved cost of Chandrayaan-3 is Rs 250 crore (Excluding Launch Vehicle Cost).Chandrayaan-3’s development phase commenced in January 2020 with the launch initially planned in 2021. However, the Covid-19 pandemic brought an unforeseen delay to the mission’s progress.Chandrayaan-3 is the ISRO’s follow-up attempt after the Chandrayaan-2 mission faced challenges during its soft landing on the lunar surface in 2019 and was eventually deemed to have failed its core mission objectives. (ANI)

Also Read : PM Modi lays foundation stone for redevelopment of 508 railway stations across country

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
PM Modi to Attend AI Action Summit in France on February 10-11: French President Macron

Macron also highlighted that the summit will focus on innovation, talent, and positioning France and Europe

11th January 2025
Banner
AAP MLA Gurpreet Gogi shot dead in Ludhiana

Aam Aadmi Party (AAP) MLA Gurpreet Gogi, representing the Ludhiana West constituency, was declared dead after being shot with bullet injuries. The incident occurred around midnight, and the MLA was declared dead upon arrival at the DMC hospital, as per officials. “The incident happened around midnight, and he was declared dead when he was brought to the DMC […]

11th January 2025
Banner
Around 10,000 Special Guests, architects of ‘Swarnim Bharat’, invited to witness Republic Day Parade 2025

A national-level competition was announced by the Department of Administrative Reforms and Public Grievances among panchayats.

10th January 2025
Banner
‘Murdered’ 17 Years Ago, Man Comes Back to Life. Here is The Real Story

The man has been identified as 50-year-old Nathuni Pal, a resident of Deoria, Bihar.

08th January 2025
Banner
Several trains delayed as dense fog covers parts of North India

The temperature recorded by the India Meteorological Department on Tuesday was 11.6 degrees Celsius in Delhi at 5.30 am.

07th January 2025