Northeast India’s Only English and Hindi Satellite News Channel

Arunachal: Tali stares at major crisis; lone bridge connecting village washed away

First Published: 19th September, 2019 15:53 IST

The lone bridge connecting Tali circle at Kra Daadi district in Arunachal Pradesh with the rest of the country has collapsed. With this breakdown, the Tali assembly constituency has been

The lone bridge connecting Tali circle at Kra Daadi district in Arunachal Pradesh with the rest of the country has collapsed.

With this breakdown, the Tali assembly constituency has been cut off from the rest of the state as it does not have any alternative road connection.

After the only transportation means to Tali which is now snapped, it is being feared that the area might face acute shortage of food and other essentials while the government has made a move on to prepare for the crisis ahead.

The Kra Daadi district administration is planning to seek assistance of the Indian Air Force to airdrop essentials. When contacted, IAF officials told Northeast Live that they are ready to extend all necessary help to the administration.

The newly constructed bridge was built by the state PWD department at a cost of Rs 14 crores. Load testing was also carried out by the district administration a few months back.

The bridge yet to be officially inaugurated, was however, being used by the commuters to reach other parts of the state.

The Bailey bridge over the Kumey river was the lifeline for 18,000 people inhabited there. The bridge connected Tali to Yangte circle in the same district.

Meanwhile, Kra Daadi district Deputy Commissioner Kurung Kummey has ordered an inquiry into the bridge collapse incident.

The inquiry will be headed by Tali ADC, Biaro Sorum. The inquiry will ascertain as to what led to the collapse of the newly constructed bridge, despite load testing was conducted successfully a few days back.

Northeast Live spoke to Tali MLA Jikke Tako regarding the incident. The MLA informed that Chief Minister Pema Khandu has been apprised of the matter and has assured all possible help including dropping of supplies by the Air Force and immediate construction of a foot suspension bridge.

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Arunachal Govt Allocates Rs 269.97 Cr For 3,097 MW Etalin Hydroelectric Project In Dibang Valley, One of the Largest Hydropower Projects of India

Etalin Hydroelectric Project Arunachal: CM handed over the cheque to Dy Commissioner of Anini, marking crucial progress for 3097 MW project.

10th April 2025
Banner
Arunachal: Borguli Farmers Build Bunds with Their Own Money to Save Their Crop from the Fury of the Siang River

Arunachal Pradesh Borguli Farmers: The flood-affected farmers of ‘Kongkin Rikyu’ WRC fields have launched a voluntary flood control programme.

10th April 2025
Banner
Arunachal’s Rupa Bayor Selected for TAGG 2026, CM Khandu Congratulates Her

Arunachal Pradesh: Bayor made history last year by becoming the first Indian to break into the top 10 of the World Poomsae Rankings.

10th April 2025
Banner
BJP MP Tapir Gao warns of ‘devastating’ impact on Northeast India from China’s Great Bend Dam

The dam could disrupt water flow from Tibet, posing risks of flash floods or reduced water availability downstream.

08th April 2025
Banner
Good News for Job Seekers in Arunachal, Cabinet Approves 280 New Posts in PHE Dept

Application details for these job posts will be available once official announcements are made

08th April 2025