Northeast India’s Only English and Hindi Satellite News Channel

Arunachal Cabinet hands over stalled hydro power projects to CPSUs

First Published: 11th January, 2023 8:15 IST

The projects have a capacity to produce 2,820 MW electricity and generate annual revenue of Rs 500 crore.

In a move that would improve the power condition in the state in the coming days, the Arunachal Pradesh cabinet on Tuesday decided to hand over five stalled hydropower projects to central PSUs. These projects have the capacity to produce 2,820 MW electricity and generate annual revenue of Rs 500 crore.

The projects which were handed over include the Naying hydropower project (1,000 MW) and the Hirong project (500 MW) to the Northeastern Electric Power Corporation (NEEPCO), the Emini hydropower project (500 MW), Amulin (420 MW), and Minundon project (400 MW) to the Satluj Jal Vidyut Nigam Limited (SJVNL), a central PSU, for execution.

“These projects will see an investment of Rs 40,000 crore in the next five to seven years and would generate green power of 2,820 MW and provide revenue of around Rs 500 crore per year in free power and around Rs 100 crore for local area development.” “The Cabinet approved the indicative procedure for transferring the stalled hydropower projects from the independent power producers to CPSUs in order to unlock the potential,” an official statement announcing the Cabinet decision said.

Tweeting about the Cabinet decision, Chief Minister Pema Khandu said, “Harnessing hydropower potential will benefit #ArunachalPradesh, locals and the nation in a sustainable manner. Today Cabinet deliberated and finalised an action plan for unlocking this rich potential, a major move to increase India’s non-fossil energy capacity to 500 GW.”

“Cabinet decided to hand over some important stalled projects currently with IPPs to CPSUs for their development. It will lead to all round growth, employment generation, ease of living and a slew of business opportunities for traders and entrepreneurs.” Chief Minister Pema Khandu on twitter.

Also Read: APPSC Paper Leak case: Wrongdoers won’t be spared, warns Arunachal HM Felix

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
NSCN (K-YA) Launching a Massive Extortion Drive in Arunachal’s Changlang?

The outfit has initiated a large-scale extortion campaign in Arunachal Pradesh's insurgency-affected Changlang district.

21st November 2024
Banner
Arunachal: Sacred Black-Necked Cranes Arrive in Tawang

Their arrival is celebrated by the Monpas of West Kameng and Tawang, who regard the birds as symbols of good fortune.

19th November 2024
Banner
Is the Rice You Eat Safe? Substandard Supplies from Punjab To NE States Spark Concerns

Samples from these shipments have failed to meet food safety standards, with some batches even deemed hazardous for human consumption.

17th November 2024
Banner
ISRO Sets Up First Space Education Lab in Arunachal’s Keyi Panyor District

The lab is the result of a collaboration between the Indian Space Research Organisation (ISRO) and Vyomika Space Academy.

15th November 2024
Banner
Union DoNER Minister Jyotiraditya Scindia Reviews Northeast Development, Highlights Over Rs 1 Lakh Cr Investment in Infrastructure

Minister Scindia is in Tripura today where he is scheduled to review DoNER schemes in the state.

15th November 2024