Northeast India’s Only English and Hindi Satellite News Channel

NE’s largest, 600 MW Hydro power plant of NEEPCO synchronizes its last unit

First Published: 20th January, 2021 19:10 IST

North Eastern Electric Power Corporation Limited (NEEPCO) has successfully synchronized the fourth generating unit of 150 MW (unit-4) of its mega 600 MW Kameng Hydro Power Plant with the grid

North Eastern Electric Power Corporation Limited (NEEPCO) has successfully synchronized the fourth generating unit of 150 MW (unit-4) of its mega 600 MW Kameng Hydro Power Plant with the grid on January 19.

Unit 1 and 2 of 150 MW each was commissioned earlier last year in the month of June, July respectively and the third generating unit in January this year.

Image

Chief Minister Pema Khandu taking to Twitter thanked Prime Minister Narendra Modi and Power Minister RK Singh for their immense support and congratulated the team members of NEEPCO.

“All the 4 units of Kameng HE Project is Synchronised with Grid & is fully Commissioned. With this Arunachal has added another 600 MW in Power sector. Thank you Honble PM Sh Narendra Modi ji & Min Power Sh RK Singh ji for the immense support. Congratulations to all team members,” Khandu tweeted.

The power plant is the largest hydropower plant commissioned in the Northeast so far, with this Arunachal Pradesh has added another 600 MW in its power sector.

The mega plant will completely change the power scenario of the North East and will also supply reliable and flexible Hydropower for crucial balancing of solar and wind power in the grid. Apart from many North-Eastern states, Haryana, UP, and Nepal are other power purchasers from the plant.

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Arunachal CM Pema Khandu Unveils Rs 228 cr Projects in West Kameng District

Rs 228 cr Projects in West Kameng District: One of the crucial projects under consideration is the Shergaon to Mandala Top road.

31st March 2025
Banner
AFSPA Extended for 6 More Months in Manipur, Nagaland and Arunachal Pradesh, THESE Areas Declared ‘Disturbed Areas’. Details Inside

The decision to extend the Act that gives special powers to the armed forces was taken after reviewing the situation in these states

30th March 2025
Banner
After Manipur, SC Judges to Visit Arunachal Pradesh to Reach Out to Its Tribal Communities

SC Judges to Visit Arunachal Pradesh: They will grace the Mega Legal Awareness Programme Camp-cum-Sewa Apke Dwar.

28th March 2025
Banner
NEIAFMR Pasighat Hosts National Seminar on Advancing Local Health Traditions & Biodiversity Research

The use of ayurvedic medicine has been coming from generations together and its healing practices have strong relevance in our north eastern states.

26th March 2025
Banner
Read About ‘Ponrung’ Bat Roost Cave in Arunachal that was Inaugurated by Minister Ojing Tasing

Arunachal ‘Ponrung’ Bat Roost Cave: An ancient and awe-inspiring natural marvel near Lokpeng Village in Siang District

22nd March 2025