Northeast India’s Only English and Hindi Satellite News Channel

Arunachal Deluge: 20 Kurung Kumey villages cut off, DC who had gone to help people gets stuck, vehicle pulled out by excavator

First Published: 8th July, 2024 20:21 IST

As many as 20 villages from Damin, Parsi Parlo and Panyasang administrative circles under Kurung Kumey district in Arunachal Pradesh are reportedly cut off from the rest of the state,

As many as 20 villages from Damin, Parsi Parlo and Panyasang administrative circles under Kurung Kumey district in Arunachal Pradesh are reportedly cut off from the rest of the state, following incessant rain this week that triggered major flash floods and landslides.

Over 5000 people from these 20 villages have so far been affected by landslides, which have raised concerns about a severe crisis of food grains, vegetables, medicines, essentials and fuel in the coming days.

Administrators are facing major challenges as far as restoration work is concerned.
Officials informed that the crisis has occurred mainly after a 52 metre long concrete bridge over the Kurung River was completely washed away due to the heavy rains and flash floods.

Although the administration has been trying to restore an alternate route, traveling through the road has become a risky affair due to heavy mudslides. Vehicles used for ferrying essentials are often getting stuck and have to be pulled out by using JCBs.

Meanwhile, the vehicle of Deputy Commissioner of Kurung Kumey, Vishaka Yadav also got stuck in the mudslides on Sunday when she was out for an inspection. Yadav informed that the administration is facing a stiff challenge in restoration of road connectivity as rains had not stopped.

However, she informed that mobile connectivity, electricity and water supply have been restored in most parts.

She also stated that the BRO is assisting the administration in the restoration work. A Bailey Bridge has been sanctioned and work will start soon.

She also informed that the state civil aviation department and the IAF choppers had been requested to carry out sorties to drop essentials, which is subject to clearance of weather conditions.

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
90 Infra Projects Worth Rs 3,417 Cr Sanctioned for Northeast Over 4 Years

The implementation of the sanctioned projects under NESIDS is carried out by the respective state governments of the Northeastern region

28th November 2024
Banner
Missing NF Railway Officer’s Body Found In Arunachal River 3 Days After He Had Gone Missing

Parshuram Kund is in the lower reaches of the Lohit River, 48 km from Tezu, the headquarters of the Lohit district.

28th November 2024
Banner
Big Boost to Energy Sector in Arunachal: Centre Approves 2 Hydro Projects Worth Rs 3,689 Cr

The central government will provide budgetary support for infrastructure development, including roads, bridges, and transmission lines.

26th November 2024
Banner
Orthography Development Underway to Preserve Mey Language in Arunachal Pradesh

The project involves the creation of alphabets in Roman script, along with a dictionary and a grammar framework

25th November 2024
Banner
Holy Dip Turns Tragic, Rlys Safety Officer Swept Away by Lohit River in Arunachal’s Parasuram Kund

Senior officials from the Tinsukia Railway Division and other divisions have rushed to the site to assist with the operations.

25th November 2024