Northeast India’s Only English and Hindi Satellite News Channel

AAI to develop greenfield airport in Arunachal’s Hollongi by November 2022

First Published: 12th October, 2020 21:49 IST

Airports Authority of India (AAI) has undertaken the work of constructing a Greenfield Airport at Hollongi, 15 kms from Itanagar while considering the importance of air connectivity to the capital

Airports Authority of India (AAI) has undertaken the work of constructing a Greenfield Airport at Hollongi, 15 kms from Itanagar while considering the importance of air connectivity to the capital city of Arunachal Pradesh. Arunachal Pradesh to have Greenfield Airport at Hollongi.

According to an official release, with an estimated cost of Rs.650 crore, the project includes the development work that is construction of airport pavements, airside work, terminal building and city side works.

With an area of 4,100 sqm, the new domestic terminal building of the Hollongi Airport will be able to handle 200 passengers during peak hours.

Equipped with eight check-in counters, the terminal building will have all modern passenger facilities. The terminal will be an energy-efficient building provisioned with a rainwater harvesting system and sustainable landscape. The development work also includes the construction of ATC Tower cum Technical Block, Fire station, Medical Centre and other ancillary works.

The building`s envelope is influenced by the surrounding landscapes, according to AAI.

Moving away from the strict geometry of straight lines and angles, the roof form is organic and establishes an instant connection with the viewer. The building interior is designed to emanate a sense of calm to the passengers. This is achieved by providing free-flowing spaces, hidden service core and a glass facade that links the eye to the panoramic scenic beauty of the Himalayan Foothills.

At present, Soil testing and field survey works are completed and site clearing work is in progress. Substructure works have already been completed and superstructure fabrication is under progress. The tentative date for completion of the project is November 2022.

Itanagar, the capital of Arunachal Pradesh is situated at the foothills of Himalayas.

Presently, no airport exists in the vicinity of Itanagar, the closest one being Lilabari Airport which is at a distance of 80 kilometers in the state of Assam and takes around three hours to reach by road. An airport to connect the capital city is a much-needed aspiration of the local community which will also act as a primary gateway to the state of Arunachal Pradesh. (ANI)

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Arunachal Govt Allocates Rs 269.97 Cr For 3,097 MW Etalin Hydroelectric Project In Dibang Valley, One of the Largest Hydropower Projects of India

Etalin Hydroelectric Project Arunachal: CM handed over the cheque to Dy Commissioner of Anini, marking crucial progress for 3097 MW project.

10th April 2025
Banner
Arunachal: Borguli Farmers Build Bunds with Their Own Money to Save Their Crop from the Fury of the Siang River

Arunachal Pradesh Borguli Farmers: The flood-affected farmers of ‘Kongkin Rikyu’ WRC fields have launched a voluntary flood control programme.

10th April 2025
Banner
Arunachal’s Rupa Bayor Selected for TAGG 2026, CM Khandu Congratulates Her

Arunachal Pradesh: Bayor made history last year by becoming the first Indian to break into the top 10 of the World Poomsae Rankings.

10th April 2025
Banner
BJP MP Tapir Gao warns of ‘devastating’ impact on Northeast India from China’s Great Bend Dam

The dam could disrupt water flow from Tibet, posing risks of flash floods or reduced water availability downstream.

08th April 2025
Banner
Good News for Job Seekers in Arunachal, Cabinet Approves 280 New Posts in PHE Dept

Application details for these job posts will be available once official announcements are made

08th April 2025