Micro tunnelling expert Chris Cooper this morning said that 3 metres of manual drilling has been done so far and about 50 metres of drilling work has been completed in total.
The supervisor could be heard asking those trapped inside the tunnel to not worry and that they would be evacuated soon
The mega railway project being built at an estimated cost of Rs 14,322 cr is expected to be ready by December this year