Northeast India’s Only English and Hindi Satellite News Channel

Tunnel collapse: Preparations to evacuate trapped workers in final stage, says CM

First Published: 23rd November, 2023 9:56 IST

According to the CMO, preparations to evacuate the workers are in the final stages and the Chief Minister himself is present in Uttarkashi.

Preparations to evacuate the 41 workers trapped in the Silkayara tunnel in Uttarkashi since November 12 are in the final stage, the Uttrakhand Chief Minister’s Office said in a press release.

According to the CMO, preparations to evacuate the workers are in the final stages and the Chief Minister himself is present in Uttarkashi.

Meanwhile, medical equipment reached the site as efforts to rescue 41 workers trapped inside the Silkyara tunnel in Uttarkashi continued on the 12th day on Thursday.

According to officials, the workers are expected to be pulled out from the collapsed tunnel today.

The workers have been trapped since November 12, when the underconstruction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side.

The operation to rescue 41 workers trapped inside a Uttarakhand tunnel for the past 12 days is in its critical phase.

As of midnight, rescue teams had said that about 10 metres of debris separated them from the trapped workers.

According to rescue teams, the operation involved drilling through the debris to push wide pipes for the trapped workers to walk out through.

The auger machine, which drills through about 3 metres of debris in an hour, had earlier hit a metal obstruction.

A 41-bed hospital readied at the Community Health Centre in Chinyalisaur for medical examination and care of trapped workers after they are evacuated from the Silkyara tunnel in Uttarkashi.

Rescue workers said the workers would go through a detailed medical examination once they reached the hospital.

Earlier in the night, NDRF personnel also carried oxygen cylinders at Uttarkashi’s Silkyara tunnel to assist in the ongoing rescue operation.

The area of entrapment, measuring 8.5 meters in height and 2 kilometres in length, is the built-up portion of the tunnel, offering safety to the labourers with available electricity and water supply. (ANI)

Read also: Uttarakhand tunnel: Matar paneer, butter roti, veg pulao served to trapped workers

COMMENTS

WE RECOMMEND

BJP appoints new state chief for Bihar and Rajasthan, announces new state in-charges and co-in-charges

The party has announced Rajdeep Roy as in charge of Northeastern state of Tripura.

26th July 2024
Banner
PM Modi to visit Drass today to commemorate 25th anniversary of Kargil Vijay Diwas

The arrangements are in full accordance with security purposes at the Kargil War Memorial at Dras, ahead of the Prime Minister's visit

26th July 2024
Banner
WB BJP President’s Proposal To Include North Bengal With Northeast Stirs Political Controversy

TMC hits back at Sukanta Majumdar, says the WB BJP president trying to provoke people

25th July 2024
Banner
President Renames Rashrapati Bhavan’s Durbar Hall & Ashok Hall

Rashtrapati Bhavan's Durbar Hall has been renamed Ganatantra Mandap, and the Ashok Hall has been renamed Ashok Mandap

25th July 2024
Banner
UPSC All Set To Revamp Its Examination System

As per reports, the commission intends to integrate cutting-edge Aadhaar-based fingerprint authentication and facial recognition for candidates

25th July 2024