Busy Umiam Bridge back to its original position after initial renovation work: CM Conrad Sangma
First Published: 2nd May, 2024 12:28 IST
DCs of East Khasi Hills and Ri-Bhoi districts had requested the PWD to identify alternate routes to ensure smooth movement of traffic while the repair work in on
Meghalaya Chief Minister Conrad Sangma has informed that some amount of refurbishment work of the crucial Umiam Bridge over the popular Umiam Lake has been done and the bridge is “back to its original position”.
In a series of tweets after a meeting on Wednesday to review the progress made in the refurbishment and retrofitting work of the Brdige, the CM wrote, “Held meeting to discuss the ongoing Umiam dam and bridge repair works. At present 60 percent of the drilling and grouting works have been completed. The bridge bearings have been refurbished. After refurbishment, the bridge has again been brought back to its original position.”
https://x.com/SangmaConrad/status/1785683284468404273
“All measures are being taken to ensure long term safety and structural stability of the bridge. We urge the public to cooperate as the ongoing construction will continue till June,” another tweet on the CM’s X handle read.
https://x.com/SangmaConrad/status/1785683298519269872
The renovation and refurbishment work of the Bridge that connects Shillong with Guwahati and handles heavy traffic including very heavy vehicles round the clock, began on March 31 this year and is scheduled to be completed by June this year.
The Bridge is over the Umiam Lake also known as Bara Pani and is a famous tourist and picnic spot.
Worth mentioning that the retrofitting work of the Bridge began on March 31 this year in view of which the Meghalaya Energy Power Generation Corporation Limited (MePGCL) had announced restrictions on the movement of vehicles.
The Deputy Commissioners (DCs) of East Khasi Hills and Ri-Bhoi districts had requested the PWD to identify alternate routes to ensure smooth movement of traffic while the repair work in on.
As per information shared by the Government of Meghalaya in it’s official website, the present work is being taken up under Dam Rehabilitation Improvement Project (DRIP). The main objective of DRIP are rehabilitation and improvement of dams and associated appurtenances safety institutional strengthening.
The major works under DRIP includes Drilling and Grouting of Dam, crack repairing and hydro mechanical works. As per preliminary reports, it was observed that seepage through the dam has reduced, the Government of Meghalaya informed. The work is tentatively scheduled to be completed by 30th June 2024, after which the road will be opened fully for traffic.
https://meghalaya.gov.in/press/content/46663
The ongoing rehabilitation work of the Umiam Bridge and the Umiam Dam will increase its lifespan by 35-40 years.
The dam and the bridge were built way back in 1965 and since then there has been a lot of concern over its structural safety forcing the government to go for rehabilitation work which started in December last year.
COMMENTS

TOPMOST STORY NOW

Live Congress’ Assam In-Charge Jitendra Singh Admits Internal Rift Over Leadership Selection
30th March 2025
Live Mob Lynches Mentally Unstable Youth in Front of Police After He Kills a Man in South Tripura
30th March 2025
Live One Dead, 2 From Assam Among 8 Injured in SMVT Bengaluru-Kamakhya Express Derailment in Odisha
30th March 2025
Live IPL 2025: Why Is Riyan Parag Being Mocked After Sara Ali Khan’s Performance Announcement Ahead of RR vs CSK in Guwahati Today?
30th March 2025WE RECOMMEND

GSI’s Breakthrough: Bauxite, Limestone, and Rare Earth Elements Found in Meghalaya
While the overall quantity of bauxite in Meghalaya ranges from low to moderate, its grade is classified as moderate.
30th March 2025
From Laban’s Civvy Street to the Ramparts of Officers’ Training Academy: Shillong Lad Ayush’s Inspiring Journey
Shillong Lad Ayush’s Inspiring Journey: The officers and personnel of 119 Inf Bn (TA) ASSAM, Shillong take immense pride in his achievement.
28th March 2025
Meghalaya Finalizes Smart Metering Tender After Prolonged Bidding Process
The project has been granted to MS Anvil Cables Pvt Ltd, Kolkata, with a strict implementation deadline set for March 31, 2026.
27th March 2025
Tura World War I Cenotaph Demolition Row: NGOs Demand Removal of West Garo Hills DC, Tura Municipal Board CEO Over Alleged Misconduct, CM Assures Action
Tura WW-I Cenotaph Demolition Row: The NGOs said that the DC and TMB CEO must step down, as their actions have eroded public trust
27th March 2025
Meghalaya Cabinet Approves Relocation of Police Reserve to Tynring in New Shillong Township
Meghalaya: Relocation of Police Reserve to Tynring: Lyngdoh highlighted its significance in reducing congestion.
27th March 2025