Northeast India’s Only English and Hindi Satellite News Channel

Churachandpur Medical College: Inaugurated in Jan, portion blown off in April

First Published: 18th April, 2023 17:51 IST

The college building was inaugurated in January this year by HM Amit Shah. A portion of the building was blown off and the structure badly damaged by a storm last

REPORTED BY MK HENRY

In January this year, Union Home Minister Amit Shah inaugurated the Churachandpur Medical College amid a lot of fanfare. People of Churachandpur were happy that they finally got a medical college and their children would no longer have to travel far from home to study medicine and become doctors.

But it just took three months and one single storm to blow off a large portion of the College building and significantly damage the building. A large portion of the building looks completely battered and bruised – portions of the walls and ceiling blown off, electrical wirings dangling dangerously.

Built at a cost of Rs 46 crore, the medical college now looks more like a plundered and ravaged building while some portions of it looks squeaky clean and new.

Walls of the library in the academic blocks (main building) on the third floor was blown away. Not just this, a portion of the wall in the backyard blown off too.

Walls of the emergency medicine blocks were also blown away causing damage to the ceilings and other structures and in this section, located at the second floor.

Director of the Churachandpur Medical College and Hospital, S. Iboyaima took stock of the damage caused by the tropical storm that hit Manipur last night.

Speaking to the media, the Director said that he had witnessed gaps in the structures which according to him had led to more damages by blowing off the walls as well as the ceilings. It may be mentioned that the building is a pre- fabricated structure and weightless walls.

Keystone Infra Construction Company Ltd, the construction company responsible for the construction of the building said that there was no compromise of any kind during the construction of the building.

One of the engineers who was engaged in the construction work said that necessary steps have been taken up to replace the damaged structures at the earliest. He assured that such things will never happen in the future.

But questions are being asked about the construction quality and if the government will take action against those responsible for such poor quality construction and if a major tragedy was averted as there was no one inside the building when the storm hit.

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
20-year-old Woman Commits Suicide in Manipur Relief Camp

The incident came to light around 4:20 p.m. today at the Mekola Gulap Higher Secondary School Relief Camp.

07th January 2025
Banner
Manipur Governor Ajay Kumar Bhalla Visits Churachandpur, Inaugurates IT Centre

Governor Bhalla interacted with the students and gave patient hearing to their suggestions as well as issues faced by the students

07th January 2025
Banner
Manipur Govt Deports 26 Myanmar Nationals Who Illegally Entered India Through State’s Border

CM N Biren Singh reiterated the state Government's commitment to providing humanitarian assistance to those fleeing conflict in Myanmar.

06th January 2025
Banner
One KCP- PWG Cadre Arrested in Manipur

The arrested KCP-PWG cadre has been identified as Thounaojam Johnson Singh alias Nanao (42).

06th January 2025
Banner
Economic Blockade Chokes NH2: Hundreds of Trucks Stranded in Manipur, Drivers Plead for Relief

The drivers and laborers, who have traveled from various states to deliver essential commodities to Manipur, are facing significant hardships.

04th January 2025