Northeast India’s Only English and Hindi Satellite News Channel

14-member rescue team from Chennai, Hyderabad to reach Meghalaya mine disaster site

First Published: 12th January, 2019 19:15 IST

A 14-member rescue team from Chennai and Hyderabad have reached Guwahati and are headed to the disaster site where 15 miners are trapped inside a flooded coal mine in East

A 14-member rescue team from Chennai and Hyderabad have reached Guwahati and are headed to the disaster site where 15 miners are trapped inside a flooded coal mine in East Jaintia Hills.

The teams from Planys Technology, Chennai and National Geophysical Research Institute, Hyderabad can play a crucial role in the rescue operations.

The team is equipped with supplements to help the Navy, which is already at the site trying to pump water out of the ill-fated mine for over 20 days.

According to sources, Scientist Dr Sudhir Kumar of the National Institute of Hydrology of Roorkee will also be visiting the site to take stock of the rescue operations.

Meanwhile, rescue operations complete a month at the rat-hole coal mine, yet the fate of the missing 15 miners, trapped inside a flooded coal pit remain uncertain.

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
It’s Ex-Manipur CM N Biren Singh Vs Meghalaya CM Conrad Sangma

Biren Singh has lashed out at Conrad Sangma, and even dragged Conrad’s late father P A Sangma

31st March 2025
Banner
GSI’s Breakthrough: Bauxite, Limestone, and Rare Earth Elements Found in Meghalaya

While the overall quantity of bauxite in Meghalaya ranges from low to moderate, its grade is classified as moderate.

30th March 2025
Banner
From Laban’s Civvy Street to the Ramparts of Officers’ Training Academy: Shillong Lad Ayush’s Inspiring Journey

Shillong Lad Ayush’s Inspiring Journey: The officers and personnel of 119 Inf Bn (TA) ASSAM, Shillong take immense pride in his achievement.

28th March 2025
Banner
Meghalaya Finalizes Smart Metering Tender After Prolonged Bidding Process

The project has been granted to MS Anvil Cables Pvt Ltd, Kolkata, with a strict implementation deadline set for March 31, 2026.

27th March 2025
Banner
Tura World War I Cenotaph Demolition Row: NGOs Demand Removal of West Garo Hills DC, Tura Municipal Board CEO Over Alleged Misconduct, CM Assures Action

Tura WW-I Cenotaph Demolition Row: The NGOs said that the DC and TMB CEO must step down, as their actions have eroded public trust

27th March 2025