Incessant rains in Arunachal Pradesh are heavily bearing down on the work of the Lower Subansiri Hydropower project. Yesterday night the guard wall of the power house broke down.
Prior to this yesterday, a portion of tunnel number 2 of the NHPC caved in. With incessant rains in neighbouring Arunachal Pradesh, the situation has become worrying with water flowing over the power project dam.
Also Read : A’chal : Restoration work at Balipara-Tawang road to conclude by tomorrow, inform BRO officials
The point to note here is that 90 percent of the construction work for the power project has been completed by the NHPC.
However, the current situation still shows that the power project is at risk due to the heavy inflow of rain water from Arunachal Pradesh. Local groups are appealing to the centre to look into the matter and avoid any possible disaster.
In total, around 1,200-1,400 houses primarily belonging to Bengali-speaking Muslims, were demolished during the eviction…
Archery World Cup final featured eight archers in men's and women's categories across both recurve…
The last date for filing of nominations is October 25 and the last date for…
The summit ends on 24th October but the Prime Minister on account of pressing commitments…
Sakshi Biswakarma will go on to represent Assam at the upcoming Miss Northeast and other…
Serene Production has acquired a 50 per cent stake in Karan Johar's Dharma Productions and Dharmatic…