Northeast India’s Only English and Hindi Satellite News Channel

CCEA approves Rs 6,700 crore for power system improvement project in Northeast states

First Published: 17th December, 2020 15:53 IST

The Cabinet Committee on Economic Affairs (CCEA) on Wednesday approved the Revised Cost Estimate (RCE) of North Eastern Region Power System Improvement Project (NERPSIP) at an estimated cost of Rs

The Cabinet Committee on Economic Affairs (CCEA) on Wednesday approved the Revised Cost Estimate (RCE) of North Eastern Region Power System Improvement Project (NERPSIP) at an estimated cost of Rs 6,700 crore.

Briefing reporters after the cabinet meeting, Information and Broadcasting Minister Prakash Javadekar said the scheme is being implemented through POWERGRID, a Public Sector Undertaking (PSU) under the Ministry of Power in association with six beneficiary states – Assam, Manipur, Meghalaya, Mizoram, Nagaland, and Tripura.

He said this is a major step towards economic development of North Eastern Region through the strengthening of intra-state transmission and distribution systems. The scheme is targeted to be commissioned by December 2021.
After commissioning, the project will be owned and maintained by the respective state utilities.

An official release said that implementation of the scheme will create a reliable power grid and improve NER states’ connectivity to the upcoming load centres, and extend the benefits of the grid-connected power to all categories of consumers.

The scheme shall also increase the per capita power consumption of these states and shall contribute to the total economic development, it said.

“Implementing agencies are hiring a considerable number of local manpower during their construction works, generating a lot of employment for skilled and unskilled manpower. After completion, additional manpower will be required for operation and maintenance of these newly created assets as per standard norms, generating considerable additional employment opportunities for North Eastern Region states,” the release said.

It said the scheme was initially approved in December 2014 as a central sector plan scheme of Ministry of Power and is being funded with the assistance of World Bank fund and by the Government of India through the budget support of Ministry of Power on 50:50 basis except for the capacity building component for Rs 89 crore, which will be entirely funded by the central government. (ANI)

COMMENTS

WE RECOMMEND

Banner
Unprecedented rainfall since April 19 damages dam and crops, leaves villagers devastated

Longsa village, known for its substantial vegetable production, has been the worst hit.

24th April 2024
Banner
Ahead of phase 2 voting, blasts damage bridge on NH 2 in Manipur

The blast is seen as an attempt to cut off communications and transportation of vital goods and essentials to capital Imphal from the rest of the country.

24th April 2024
Banner
Highlander Brigade gears up for action-packed off-season football festivities

The club operates as an independent and non-profit supporters' club that supports Northeast United FC

24th April 2024
Banner
Arunachal CM Pema Khandu congratulates VogueStar Miss India 2024 Duyir Ete 

Chief Minister Khandu said that Ete's achievement in the pageant reflects the broad spectrum of skill among the youth of Arunachal Pradesh.

24th April 2024
Banner
Tripura Cong leader Sudip Roy Barman criticise PM Modi over ‘unfulfilled’ promises

Roy Barman stated that these unmet promises not only signify a failure of governance but also reflect a broader pattern of governmental ineptitude.

24th April 2024