Northeast India’s Only English and Hindi Satellite News Channel

Chandrayaan-3: Upclose images of moon as captured by Vikram lander

First Published: 18th August, 2023 16:49 IST

ISRO on Friday released images of the moon as captured by the position detection camera attached to the lander right after the successful separation of the lander from the propulsion

Chandrayaan-3 is just days away from its final destination, the moon. On August 23 the Vikram Lander of Chandrayaan 3 is expected to make a soft landing on the south pole of the moon.

ISRO on Friday released images of the moon as captured by the position detection camera attached to the lander right after the successful separation of the lander from the propulsion module. Here are some of the pictures:

The Chandrayaan-3 mission’s lander is named after Vikram Sarabhai (1919–1971), who is widely regarded as the father of the Indian space programme.

On Wednesday, the spacecraft carried out the final lunar-bound orbit reduction manoeuvre of the Chandrayaan-3 spacecraft, a week ahead of its scheduled landing on the south pole of the moon on August 23.

A GSLV Mark 3 (LVM 3) heavy-lift launch vehicle was used for the launch of the spacecraft that was placed in the lunar orbit on August 5 and since then it has been through a series of orbital manoeuvres.

It has been a month and three days since the Indian Space Research Organisation launched the Chandrayaan-3 mission on July 14. The spacecraft was launched from the Satish Dhawan Space Centre in Andhra Pradesh’s Sriharikota.

ISRO is bidding to make a successful soft landing on the moon, which will make India the fourth country in the world to achieve the feat after the United States, Russia, and China.
The stated objectives of Chandrayaan-3, India’s third lunar mission, are safe and soft landing, rover roving on the moon’s surface, and in-situ scientific experiments.

The approved cost of Chandrayaan-3 is Rs 250 crores (excluding launch vehicle cost).
Chandrayaan-3’s development phase commenced in January 2020 with the launch planned sometime in 2021. However, the COVID-19 pandemic brought an unforeseen delay to the mission’s progress.

Chandrayaan-3 is the ISRO‘s follow-up attempt after the Chandrayaan-2 mission faced challenges during its soft landing on the lunar surface in 2019 and was eventually deemed to have failed its core mission objectives.

Meanwhile, the Chairman of the Indian Space Research Organisation (ISRO), S Somanath last week expressed confidence in the progress of the Chandrayaan 3, providing reassurance that all systems were operating as planned.

Chairman S Somanath stated, “Everything is going fine now. There will be a series of manoeuvres until it lands (on the Moon) on 23rd August. The satellite is healthy.”

Moon serves as a repository of the Earth’s past and a successful lunar mission by India will help enhance life on Earth while also enabling it to explore the rest of the solar system and beyond.

Historically, spacecraft missions to the Moon have primarily targeted the equatorial region due to its favourable terrain and operating conditions. However, the lunar south pole presents a vastly different and more challenging terrain compared to the equatorial region. (ANI)

Also Read: Chandrayaan-3 marks giant leap, lander successfully separates from propulsion module

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
India has stayed away from ideas of expansionism, resource-capturing: PM tells Guyana Parliament

PM Modi said the relations betwen India and Guyana are very deep and it is a relation of soil, sweat, diligence.

22nd November 2024
Banner
India to establish ‘Jan Aushadhi Kendras’ in Guyana; increase defence, energy cooperation, announces PM Modi

PM Modi also termed his visit 'the first by an Indian PM to Guyana' as a "significant milestone" for the ties between the two countries.

21st November 2024
Banner
CBSE X and XII exams 2025 to begin from February 15; datesheet out

The chemistry exam is scheduled to take place on February 27, 2025, and the Business studies exam will take place on February 22.

21st November 2024
Banner
Punjab Police Arrests 2 Assam Men in ‘Digital Arrest’ Cyber Fraud Case

IP logs from WhatsApp and Skype indicated that the fraudulent calls originated from locations in Cambodia and Hong Kong.

19th November 2024
Banner
India’s First Hydrogen Train to Roll Out Next Month, Details on route, facilities, speed and more…

This pilot project is just the beginning. Indian Railways plans to deploy up to 35 hydrogen-powered trains across the country

19th November 2024