Northeast India’s Only English and Hindi Satellite News Channel

Arunachal: CM Khandu pulls up officials over slow progress of NH-415 four-laning work

First Published: 24th June, 2024 18:05 IST

CM Khandu said that the ‘dismally slow’ construction process of the four-lane highway stretch is causing extreme inconvenience to commuters.

Arunachal Chief Minister Pema Khandu has expressed total dismay over the slow pace of construction of NH-415 from Papu Nallah to Nirjuli where work has been going on for the four-laning of the highway.

Chief Minister Khandu held a review meeting and said that the ‘dismally slow’ construction process of the four-lane highway stretch is causing extreme inconvenience to commuters.

The Chief Minister directed the concerned officials to immediately expedite the work without compromising on quality.

Expressing concern over the damages caused by heavy rains in Itanagar and adjoining areas, CM Khandu instructed the departments concerned to immediately undertake repair works, especially on the highway to ensure smooth flow of traffic and to prevent any disruption to people’s routines.

Heavy downpour has left a trail of destruction in Itanagar on Sunday. The crucial NH-415 between Itanagar and Naharlagun has been damaged at multiple locations with a portion of the highway at BP Plaza in Itanagar completely washed away.

Three places — Itanagar- Papunallah, Niti Vihar, and Abotani colony have been severely affected by the sudden rains.

Additionally, instances of landslides have also been reported from various locations.

Also Read: Arunachal: Cloudburst, flash floods cause massive damage in Itanagar

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
Safeguarding Northeast’s Identity and Culture Top Priority: Home Minister Amit Shah at NEC Plenary

Amit Shah further stressed the need for a shift in focus from countering extremism to empowering citizens with constitutional rights.

21st December 2024
Banner
“Pema Khandu is Immature…”: SIFF Hits Back at CM Khandu On Upper Siang Multipurpose Project Remarks

He maintained that the SIFF's actions are purely driven by local concerns, and the accusations of foreign involvement are baseless.

20th December 2024
Banner
Indigenous Identity at Risk, NEIPF Urges NE MPs to Take Action to Stop Influx of Myanmar and Bangladesh Refugees into Northeast

The NEIPF is planning to meet all the CMs of the Northeastern states for meaningful discussions

19th December 2024
Banner
Union Road Transport Ministry Sanctions Rs 398 Crore for Road Development Projects in Arunachal Pradesh

Arunachal Pradesh Chief Minister Pema Khandu took to X to thank the Union Minister for this significant development.

19th December 2024
Banner
Arunachal Karatekas Win 6 Medals At KIO All India Sub-Junior National Karate C’ship 2024

Their success not only brings pride to Arunachal but also inspires the next generation of karate enthusiasts.

16th December 2024