Northeast India’s Only English and Hindi Satellite News Channel

Connectivity to North Sikkim restored fully, Bailey bridge inaugurated in Chungthang

First Published: 16th November, 2023 11:25 IST

The washing away of the only permanent bridge at Chungthang had severed connectivity with both Lachen and Lachung valleys.

After over 45 days of North Sikkim being cut off from the rest of Sikkim and the country because of a glacial lake burst washing away roads and bridges and snapping connectivity in the region, connectivity was restored this morning after the Bailey bridge constructed by the Border Roads Organisation (BRO) in Chungthang was inaugurated this morning.

The opening of the bridge has restored vital connectivity between Mangan and Chungthang.

But it has been the BRO which has played the key role to make this happen as it could successfully overcome the daunting task of constructing the abutments (a structure built to support the lateral pressure of an arch or span, at the ends of a bridge) in difficult terrain.

It was indeed very challenging since abutment works involved manual construction of massive concrete structures on the steep cliffs flanking both sides of the Teesta. But braving all adversitives the BRO could accomplish the construction in less than 3 weeks since works began on October 12 and completed on October 30.

The bridge serves as a crucial lifeline, reinstating road connectivity and offering essential relief to the local residents coping with repercussions of the flash floods.

Sikkim PWD Minister Samdup Lepcha, Sonam Tashi, ADM Mangan, BRO, Army and District Administration officials were present during the inauguration of the bridge.

On October 4, Sikkim experienced an unprecedented situation following a deluge created by the Glacial Lake Outburst Flood (GLOF) in the South Lhonak Lake. Gushing waters of the swelling Teesta river caused immense devastation in the downstream areas along its banks and had swept away six essential bridges in North Sikkim, including the critical Chungthang bridge thus severing lines of communication to Lachen and Lachung valley.

To restore connectivity to North Sikkim, in phase one, BRO undertook challenging task of construction of massive amount of river training work. Post completion of essential river training works, BRO in coordination with Army launched two bailey bridges at Sanklang. Thus, restoring connectivity between Mangan and Dzongu region. These Bridges were opened for civil traffic from October 27 onwards.

As part of phase two of restoration efforts, BRO shifted its focus towards Chungthang town, which suffered extensive devastation during flash floods including washing away of only permanent bridge at Chungthang thus severing connectivity of both Lachen and Lachung valleys.

Read also: Sikkim floods: SDF seeks CBI probe against CM PS Tamang

COMMENTS

WE RECOMMEND

Banner
Sikkim’s Nepali film, Tara: The Lost Star to debut at Cannes International Film Festival 2024

The film is Directed by Samten Bhutia and produced by Sabitri Chettri, under the banner of SaDa Productions in association with Passang Mintok Films marks a significant milestone for the region.

11th May 2024
Banner
6 from Northeast conferred Padma Shri award for 2024

Nagaland's Sano Vamuzo and Meghalaya's Dr. Sangthankima were conferred the Padma Shri for their distinguished service in the field of social work.

10th May 2024
Banner
Sikkim : ‘Girish And The Chronicles (GATC)’ to kick off European tour from May 9 to 30

Germany is next on the list, which marks GATC’s debut performance in Germany on May 15, with a promise to deliver a complete rock n roll experience for their German fanbase.

04th May 2024
Banner
25-year-old man dies after falling from log bridge over Teesta River in North Sikkim

The deceased has been identified as Rapzung Lepcha, resident of Lum village.

04th May 2024
Banner
Sikkim sees record-breaking surge in tourist inflow, numbers may touch 1.2 million by year-end

According to official figures released by the Department of Tourism and Civil Aviation, the Himalayan state saw 290,401 visitors for sightseeing in the state till March 31.

30th April 2024