Northeast India’s Only English and Hindi Satellite News Channel

ISRO successfully performs orbit reduction manoeuvre, brings Chandrayaan-3 closer to moon

First Published: 7th August, 2023 8:03 IST

The space agency said it will carry out the next such operation on August 9.

The Indian Space Research Organisation (ISRO) on Sunday said the GSLV Mark 3 (LVM 3) heavy-lift launch vehicle, which lifted off successfully with the Chandrayaan-3 spacecraft, underwent a planned orbit reduction manoeuvre, bringing it closer to the moon.
The space agency said it will carry out the next such operation on August 9.

“The spacecraft successfully underwent a planned orbit reduction manoeuvre. The retrofitting of engines brought it closer to the Moon’s surface, now to 170 km x 4313 km. The next operation to further reduce the orbit is scheduled for August 9, between 13:00 and 14:00 hours IST,” the ISRO tweeted on Sunday.
Meanwhile, the space agency on Sunday put out the first images of the moon as captured by Chandrayaan-3, India’s third lunar mission.

Chandrayan-3 captured stunning images of the lunar surface after entering the Moon’s orbit on Saturday.
“The Moon, as viewed by #Chandrayaan3 spacecraft during Lunar Orbit Insertion (LOI) on August 5, 2023,” tweeted the Mission’s official Twitter handle.
The Chandrayaan-3 spacecraft, which covered about two-thirds of the distance to the Moon since its launch, successfully entered into the Lunar orbit on Saturday, according to ISRO.
The spacecraft, mounted on GSLV Mark 3 (LVM 3) heavy-lift launch vehicle, successfully lifted off from the Satish Dhawan Space Centre in Andhra Pradesh’s Sriharikota on July 14.
India became only the fourth country after the US, China, and Russia to land its spacecraft on the surface of the moon, demonstrating the country’s ability for a safe and soft landing on the lunar surface.
Upon landing, it will operate for one lunar day, which is approximately 14 Earth days. One day on the Moon is equal to 14 days on Earth.
The approved cost of Chandrayaan-3 is Rs 250 crore (Excluding Launch Vehicle Cost).Chandrayaan-3’s development phase commenced in January 2020 with the launch initially planned in 2021. However, the Covid-19 pandemic brought an unforeseen delay to the mission’s progress.Chandrayaan-3 is the ISRO’s follow-up attempt after the Chandrayaan-2 mission faced challenges during its soft landing on the lunar surface in 2019 and was eventually deemed to have failed its core mission objectives. (ANI)

Also Read : PM Modi lays foundation stone for redevelopment of 508 railway stations across country

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
India has stayed away from ideas of expansionism, resource-capturing: PM tells Guyana Parliament

PM Modi said the relations betwen India and Guyana are very deep and it is a relation of soil, sweat, diligence.

22nd November 2024
Banner
India to establish ‘Jan Aushadhi Kendras’ in Guyana; increase defence, energy cooperation, announces PM Modi

PM Modi also termed his visit 'the first by an Indian PM to Guyana' as a "significant milestone" for the ties between the two countries.

21st November 2024
Banner
CBSE X and XII exams 2025 to begin from February 15; datesheet out

The chemistry exam is scheduled to take place on February 27, 2025, and the Business studies exam will take place on February 22.

21st November 2024
Banner
Punjab Police Arrests 2 Assam Men in ‘Digital Arrest’ Cyber Fraud Case

IP logs from WhatsApp and Skype indicated that the fraudulent calls originated from locations in Cambodia and Hong Kong.

19th November 2024
Banner
India’s First Hydrogen Train to Roll Out Next Month, Details on route, facilities, speed and more…

This pilot project is just the beginning. Indian Railways plans to deploy up to 35 hydrogen-powered trains across the country

19th November 2024