Trans-Arunachal Highway scam: PWD Junior Engineer arrested for misuse of road construction funds
First Published: 28th June, 2019 17:06 IST
In a major crackdown on non-performing officials and alleged charges of misappropriation of funds, the Special investigation team on Thursday arrested Junior Engineer of the PWD Kabak Bath in connection
In a major crackdown on non-performing officials and alleged charges of misappropriation of funds, the Special investigation team on Thursday arrested Junior Engineer of the PWD Kabak Bath in connection with the multi-crore Trans-Arunachal Highway scam.
According to Special investigation team sources, Bath was arrested in connection with the ongoing investigation into the scam involved in the disbursement of compensation for the construction of the 157.7-km Bopi-Potin road of Arunachal Pradesh.
The arrest was made after the investigation of the money trail pointed to the role of Kabak Bath in the case. Bath was arrested at the Itanagar police station after he was questioned about the money trail and he could not give answers.
Kabak Bath was arrested in connection with FIR No 2/19 of the SIC police station case, under Sections 409, 420, 467, 468 and 471 of the IPC, read with Section 13(2) of the Prevention of Corruption Act.
COMMENTS
TOPMOST STORY NOW
Live Meghalaya petrol bomb attacks: Asked DGP to ensure such incidents do not repeat, says Dy CM Prestone Tynsong
01st May 2024Live Petrol bombs the new weapon of violence in Meghalaya?
01st May 2024Live PMEAC Member Sanjeev Sanyal delivers Prof Sarat Mahanta Memorial Lecture in Guwahati
01st May 2024Live Babar Azam moves to fourth spot in T20I rankings, Suryakumar Yadav continues to be at top
01st May 2024WE RECOMMEND
Arunachal’s Toko Takum wins gold, Likha Deechum wins gold and silver at the National Badminton Championship
Arunachal Pradesh’s Chief Minister Pema Khandu and Deputy CM Chowna Mein congratulated the players on their achievement
30th April 2024Arunachal Cong demands another repoll in 2 polling stations under Nacho Assembly constituency
APCC Vice President Toko Mina highlighted serious violations at the 22-Dingsar polling station, citing delays in the voting process and discrepancies between the recorded votes and the Register of Voters.
29th April 2024“I bow to citizens of Arunachal Pradesh…”: Arunachal CM Khandu thanks voters
CM Khandu extended his greetings to the people of Arunachal for their overwhelming participation, saying that it “displayed exemplary commitment to democratic ethos of the country”.
27th April 2024Arunachal Repolling in 8 PS: 79.80% turnout recorded
The total voter turnout in the state now stands at 77.7% (Parliamentary Constituencies) and 82.95% (Assembly Constituencies).
26th April 2024Row over Chakma-Hajong: Union Minister Rijiju says his comments were twisted, misinterpreted; attempt to tarnish Assam CM’s image
Rijiju alleged that his remark has been fabricated to create confusion at a time when Lok Sabha polls are underway.
25th April 2024