Northeast India’s Only English and Hindi Satellite News Channel

Meghalaya: Umiam bridge repair works to be completed on time, informs CM Conrad Sangma

First Published: 2nd May, 2024 15:46 IST

CM Sangma stated that 60% of the drilling and grouting works have been completed.

CM Sangma stated that 60% of the drilling and grouting works have been completed. He further informed, “the bridge bearings have been refurbished. After refurbishment, the bridge has again been brought back to its original position. All measures are being taken to ensure long term safety and structural stability of the bridge.”

COMMENTS

Leave a Reply

Your email address will not be published. Required fields are marked *

WE RECOMMEND

Banner
GEPL Starts Drilling Activities in Arunachal Pradesh

GEPL operates the Kharsang oilfield in a joint venture with Oil India Limited and JEKPL

02nd April 2025
Banner
Assam Panchayat Elections to Be Held in Two Phases on May 2 and May 7

The filing of nominations for the Assam Panchayat elections is set to begin tomorrow.

02nd April 2025
Banner
Attempt Gangrape Girl Inside Moving Bus In Assam: Driver, One Accomplice Arrested

Gangrape Inside Moving Bus In Assam: Vehicle involved in the incident has also been seized as part of the investigation.

02nd April 2025
Banner
Assam: Anjali Daimary, Sister of Ex-NDFB Chief Ranjan Daimary, Launches Political Party in BTR Ahead of BTC Polls

Anjali Daimary said, "Our party stands above lies and money. We are committed to complete transparency.

02nd April 2025
Banner
Meghalaya FC Secures 3rd Place at 2nd Edition of Indo-French Tournament in Paris

Meghalaya FC: Sangma also acknowledged the team’s perseverance and highlighted their previous success as runners-up in the Subroto Cup.

02nd April 2025