Northeast India’s Only English and Hindi Satellite News Channel

Sikkim: Teesta-III Dam damaged due to SKM Govt’s failure to follow rules and take precautions, alleges SDF

First Published: 1st February, 2024 20:11 IST

"The SKM government is playing around just to fool people," said SDF spokesperson M K Subba

Sikkim Democratic Front (SDF) spokesperson M K Subba today said that the ruling Sikkim Krantikari Morcha (SKM) government needs to provide many clarifications because it is clear that they have terribly neglected to follow certain guidelines and take preventative measures while maintaining the Teesta Stage III Dam, which led to the dam’s damage following the catastrophic flood last year.

Speaking exclusively Northeast Live, M K Subba said, “From day one, the present government (SKM) is saying that the Dam was washed away because it was constructed on a very weak foundation. The pre-construction procedure was absolutely correct and the Central Water Commission obtained approval from the Central Electricity Authority for all aspects of it, including the survey and technical details. The SKM government is playing around just to fool people.”

He said that it is the SKM government which has not taken preventative measures and followed certain guidelines such as the Disaster Management Act, 2005 and Dam Safety Act 2021 while maintaining the Teesta Stage III Dam.

Due to its lapses in the above-mentioned issues, the present government is now required to provide many explanations. The incumbent SKM government is blatantly trying to suppress the actual facts and figures to misguide and confuse the public on such an important matter of public interest and security, he added.

He further said that SDF has sought an independent central agency investigation on the complete destruction of the Teesta Stage III Dam and the insurmountable loss of lives and damage to properties.

On November 10, 2023 Subba has also submitted a memorandum to the Ministry of Home Affairs seeking early intervention of the Central government to set up a CBI enquiry into the matter.

SDF has also sought to investigate on the SKM government’s deliberate non-compliance with the mandatory provisions of the Disaster Management Act 2005, deliberately not taking any preventive or mitigation measures despite clear classification of South Lhonak Lake and Chungthang, along with the subsequent downstream settlement, as a high GLOF hazard zone.

Teesta stage III Hydro Electricity Dam at Chungthang, North Sikkim was completely damaged by the catastrophic floods caused by the Glacial Lake Outburst Flood (GLOF) which occurred on the 3 and 4 of October 2023 from the South Lhonak Lake in North Sikkim.

Also Read: Pre-poll violence continues in Sikkim, SDF’s Subash Sotang Rai allegedly attacked by SKM supporters

COMMENTS

WE RECOMMEND

Banner
Sikkim’s Nepali film, Tara: The Lost Star to debut at Cannes International Film Festival 2024

The film is Directed by Samten Bhutia and produced by Sabitri Chettri, under the banner of SaDa Productions in association with Passang Mintok Films marks a significant milestone for the region.

11th May 2024
Banner
6 from Northeast conferred Padma Shri award for 2024

Nagaland's Sano Vamuzo and Meghalaya's Dr. Sangthankima were conferred the Padma Shri for their distinguished service in the field of social work.

10th May 2024
Banner
Sikkim : ‘Girish And The Chronicles (GATC)’ to kick off European tour from May 9 to 30

Germany is next on the list, which marks GATC’s debut performance in Germany on May 15, with a promise to deliver a complete rock n roll experience for their German fanbase.

04th May 2024
Banner
25-year-old man dies after falling from log bridge over Teesta River in North Sikkim

The deceased has been identified as Rapzung Lepcha, resident of Lum village.

04th May 2024
Banner
Sikkim sees record-breaking surge in tourist inflow, numbers may touch 1.2 million by year-end

According to official figures released by the Department of Tourism and Civil Aviation, the Himalayan state saw 290,401 visitors for sightseeing in the state till March 31.

30th April 2024