Northeast India’s Only English and Hindi Satellite News Channel

NE’s largest, 600 MW Hydro power plant of NEEPCO synchronizes its last unit

First Published: 20th January, 2021 19:10 IST

North Eastern Electric Power Corporation Limited (NEEPCO) has successfully synchronized the fourth generating unit of 150 MW (unit-4) of its mega 600 MW Kameng Hydro Power Plant with the grid

North Eastern Electric Power Corporation Limited (NEEPCO) has successfully synchronized the fourth generating unit of 150 MW (unit-4) of its mega 600 MW Kameng Hydro Power Plant with the grid on January 19.

Unit 1 and 2 of 150 MW each was commissioned earlier last year in the month of June, July respectively and the third generating unit in January this year.

Image

Chief Minister Pema Khandu taking to Twitter thanked Prime Minister Narendra Modi and Power Minister RK Singh for their immense support and congratulated the team members of NEEPCO.

“All the 4 units of Kameng HE Project is Synchronised with Grid & is fully Commissioned. With this Arunachal has added another 600 MW in Power sector. Thank you Honble PM Sh Narendra Modi ji & Min Power Sh RK Singh ji for the immense support. Congratulations to all team members,” Khandu tweeted.

The power plant is the largest hydropower plant commissioned in the Northeast so far, with this Arunachal Pradesh has added another 600 MW in its power sector.

The mega plant will completely change the power scenario of the North East and will also supply reliable and flexible Hydropower for crucial balancing of solar and wind power in the grid. Apart from many North-Eastern states, Haryana, UP, and Nepal are other power purchasers from the plant.

COMMENTS

WE RECOMMEND

Banner
Arunachal Elections 2024: Over 8.8 lakh voters to exercise franchise for Assembly and Lok Sabha polls tomorrow

There will be 2,226 polling stations spread over the entire state.

18th April 2024
Banner
Arunachal Pradesh: CEO reports 100% arm license deposit and stringent security measures

Sain expressed gratitude to the people of Arunachal Pradesh for their support in conducting a free, fair, and peaceful election

17th April 2024
Banner
Last day of campaigning for 1st phase of LS polls and assembly polls in Arunachal, Sikkim

By the Model Code of Conduct (MCC) rules, political advertisements or campaigns for the first phase and Assembly polls will come to an end at 5 PM

17th April 2024
Banner
Arunachal: APPSC SOP for conduct of exams almost ready, says CM Pema Khandu

CM Khandu said that the newly constituted Comission is already on its job and that necessary advertisements for recruitment will be out once everything falls in place.

16th April 2024
Banner
Arunachal: BJP president Biyuram Waghe pledges development for Pakke Kessang constituency if elected

Biyuram Waghe said that the BJP is positioned for a sweeping triumph across the remaining 50 assembly constituencies as well. The party has won 10 seats uncontested.

15th April 2024